Cast stone installation inside the weatherproof
box on the drum of the dome.
MARCH 2002
Image Gallery
March 5, 2002

Mechanical Mezzanine level as the pre-cast dome panels are attached to the dome steel.
March 5, 2002

View from the tower crane as the pre-cast concrete and curved panels are installed.
March 6, 2002

Scaffolding preparation for installation of the dome's interior panels.
March 6, 2002

Pre-cast installation.
March 14, 2002

Lower corridor window after installation.
March 27, 2002

Workers bring cast stone up to the colonnade.
March 27, 2002

Curved dome panels during installation.
Site provided by Frankfurt-Short-Bruza (FSB) Architects / Engineers of Record for the State Capitol Dome