July 2, 2002
View of the interior of
the dome before
painting, looking
through the scaffolding.
|
|
|
|
July 3,
2002
Column
cover section during
installation.
|
|
|
|
July 12,
2002
Detail
of the stain glass seal
during fabrication at
Triffo's Glass Studio.
|
|
|
|
July 16, 2002
Exterior of the Dome
before installation of
the column covers.
|
|
|
|
July 16, 2002
Workers install column
covers.
|
|
|
 |
July 16, 2002
View of the interior of
the dome looking through
the oculus. |
|
|
|
|
|
|
July 16, 2002
Above: View
of the exterior of the
dome shot from the tower
crane. |
|
July 22, 2002
Below:
Column cover
installation seen from
the tower crane. |
|
|
|
|
|
|
July 24, 2002
View
of the dome during
painting, also seen are
the red coffers. |
|
|
|
July 24, 2002
Painting of the coffers. |
|
|
 |
July 25, 2002
Workers
paint the interior of
the dome.
|
|
|
 |
July 25, 2002
Stain glass lighting
test. More than
100 hours of testing
were completed before
the stain glass
installation. |
|
|
 |
July 26, 2002
From left - John
Jamison, Jim Triffo, Pat
Wood, and Jim Bruza pose
with the official stain
glass seal during
unveiling.
|
|
|
 |
July 26, 2002
Detail of the stain
glass.
|
|
|
 |
July 30, 2002
Installation of the
column capitals. |
|
|
 |
|
July 31, 2002,
above
View of the tower crane
of the column capitals.
|