Christmas at the dome.

DECEMBER 2001
Image Gallery

December 3, 2001

Job-site elevators.
December 3, 2001

Pre-cast panels sit on-site awaiting installation.
December 3, 2001

Oculus and Mechanical Mezzanine level.
December 7, 2001

The capitol's Christmas tree stands tall on the front steps of the south side entrance.
December 17, 2001

Liquid foam is sprayed on the dome's steel beams to protect the structure from fire.
December 17, 2001

Workers inside the weatherproof box prepare to set the first level of cast stone.
December 17, 2001

Ship ladders are used to reach the highest levels of the dome.
December 20, 2001

Underside of the dome's mechanical mezzanine and ocula. The ocula can be considered the eye of the dome.
December 20, 2001

The cast stone is being set.
December 21, 2001

Below: Workers begin to install weatherproofing around the dome's perimeter.
December 21, 2001

Weatherproofing the dome will help protect the structure from exposure to weather without damage.
December 28, 2001

The first few rows of cast stone are installed to the dome's circumference.
December 28, 2001

Workers ensure that each cast stone is placed in its precise location.
Site provided by Frankfurt-Short-Bruza (FSB) Architects / Engineers of Record for the State Capitol Dome