August 1, 2002
Inspection of the stain
glass frame before
installation.
|
|
|
|
August 3,
2002
Jim
Triffo and Pat Wood
install the stain glass
skylight. |
|
|
|
August 12,
2002
A
close-up of installed
stain glass skylights. |
|
|
|
August 6, 2002
Installation of a soffit
above a column capital.
|
|
|
|
August 16, 2002
View of installed
column capitals.
|
|
|
 |
August 22, 2002
Installation of the
brass handrails at the
oculus. |
|
|
|
|
|
|
|
August 25, 2002,
above
View
of the dome as exterior
scaffolding is
dismantled. |