Decorative finials at the top of the cupola.
APRIL 2002
Image Gallery
April 4, 2002
Workers at the colonnade level.
April 5, 2002
Pre-cast panels are installed in preparation for the installation of the column base.
April 5, 2002
The bottom of the "dog houses" which are statuary bases of future statuary.
April 11, 2002
Cast stone is installed around the opening for the 16 foot high rotunda window.
April 17, 2002
Pre-cast column bases during installation.
April 17, 2002
Above: Wooden templates surround the cupola in preparation for the installation of the cupola columns.
Site provided by Frankfurt-Short-Bruza (FSB) Architects / Engineers of Record for the State Capitol Dome